How do you keep the sea out of a country that lies below it? Ten questions about the dams, gates and barriers of the Delta Works, and the night that started it all.
Dyke walker 0–4 · Barrier builder 5–8 · Master of the tides 9–10
Pick one
On the night of 31 January 1953 a storm and a high spring tide broke through the dykes, mostly in Zeeland. Within weeks the government set up a commission that drew up the Delta Plan.
Photo: Agency for International Development, Wikimedia Commons, Public domain.
Pick one
Zeeland is a province of islands and estuaries where the Rhine, Meuse and Scheldt meet the sea. Its name even means 'sea land'.

Photo: Wikimedia Commons, CC BY-SA 3.0.
Pick one
The first plan was a closed dam, but fishermen and nature lovers protested. Now the tide flows in and out as usual, so oysters and mussels can still live there, and the gates only close in a storm.
Photo: Rens Jacobs / Beeldbank V&W ., Wikimedia Commons, Attribution.
Pick one
Neeltje Jans was a sandbank that was raised into a work island for the construction. Today it has a park with attractions and a nature reserve, and in 2015 a stage of the Tour de France even finished there.

Photo: Bryan Tong Minh, Wikimedia Commons, CC BY 2.5.
Pick one
The caissons were built for the floating harbours of the Normandy landings in the Second World War, but these four were never used there. In November 1953 they closed the last gap in the broken dyke, and now they hold the Watersnoodmuseum.

Photo: Hans van der Bie, Wikimedia Commons, Public domain.
Pick one
Building the little version in Madurodam took six months. The real barrier took six years.

Photo: Gellerj, Wikimedia Commons, CC BY-SA 3.0.
Pick one
The American Society of Civil Engineers chose the Delta Works together with the Zuiderzee Works. The list also includes the Channel Tunnel and the Panama Canal.
Pick one
On 4 October 1986 Queen Beatrix opened the barrier with the famous words: 'The storm surge barrier is closed. The Delta Works are completed. Zeeland is safe.' Her mother, Queen Juliana, had already stepped down in 1980.

Photo: RVD Koninklijk Huis, Wikimedia Commons, CC0.
Pick one
In 1953 the dykes along the Hollandse IJssel came close to breaking, which put about 1.5 million people at risk. So this barrier near Rotterdam was built first, while the Haringvliet dam took until 1971.

Photo: Jan van Galen, Wikimedia Commons, CC BY-SA 4.0.
Pick one
The barrier is run by a computer that reads weather and sea level data and starts closing by itself when a storm surge of about 3 metres is expected. Its two gates are each about 210 metres long.
Photo: DeltaWorks Online - Eszter Simonfi, Wikimedia Commons, CC BY-SA 3.0.
Paste the code into your page. The player fits itself in, and every vote counts in Votur.
On WordPress, Ghost or Squarespace? Just paste the link of this page into your post.
This is how it looks
Also fun