How do you keep the sea out of a country that lies below it? Ten questions about the dams, gates and barriers of the Delta Works, and the night that started it all.

Dyke walker 0โ€“4 ยท Barrier builder 5โ€“8 ยท Master of the tides 9โ€“10

The Delta Works were built after a terrible flood. In which year did that flood happen?

or

Tap the right answer

Correct answer: 1953

On the night of 31 January 1953 a storm and a high spring tide broke through the dykes, mostly in Zeeland. Within weeks the government set up a commission that drew up the Delta Plan.

Photo: Agency for International Development, Wikimedia Commons, Public domain.

Read more on Wikipedia

In which Dutch province are most of the Delta Works?

or

Tap the right answer

Correct answer: Zeeland

Zeeland is a province of islands and estuaries where the Rhine, Meuse and Scheldt meet the sea. Its name even means 'sea land'.

Photo: Wikimedia Commons, CC BY-SA 3.0.

Read more on Wikipedia

Who decides when the Maeslantkering, the giant barrier near Rotterdam, closes?

or

Tap the right answer

Correct answer: A computer system

The barrier is run by a computer that reads weather and sea level data and starts closing by itself when a storm surge of about 3 metres is expected. Its two gates are each about 210 metres long.

Photo: DeltaWorks Online - Eszter Simonfi, Wikimedia Commons, CC BY-SA 3.0.

Read more on Wikipedia

The Eastern Scheldt barrier has huge gates that are normally left open. Why?

or

Tap the right answer

Correct answer: To keep the salt water sea life alive

The first plan was a closed dam, but fishermen and nature lovers protested. Now the tide flows in and out as usual, so oysters and mussels can still live there, and the gates only close in a storm.

Photo: Rens Jacobs / Beeldbank V&W ., Wikimedia Commons, Attribution.

Read more on Wikipedia

Neeltje Jans lies in the middle of the Eastern Scheldt barrier. What is it?

or

Tap the right answer

Correct answer: An artificial island made to help build the barrier

Neeltje Jans was a sandbank that was raised into a work island for the construction. Today it has a park with attractions and a nature reserve, and in 2015 a stage of the Tour de France even finished there.

Photo: Bryan Tong Minh, Wikimedia Commons, CC BY 2.5.

Read more on Wikipedia

The museum about the 1953 flood in Ouwerkerk is housed inside what?

or

Tap the right answer

Correct answer: Four huge concrete caissons

The caissons were built for the floating harbours of the Normandy landings in the Second World War, but these four were never used there. In November 1953 they closed the last gap in the broken dyke, and now they hold the Watersnoodmuseum.

Photo: Hans van der Bie, Wikimedia Commons, Public domain.

Read more on Wikipedia

Where can you see a working copy of the Maeslantkering at a scale of 1 to 250?

or

Tap the right answer

Correct answer: In Madurodam, the miniature park in The Hague

Building the little version in Madurodam took six months. The real barrier took six years.

Photo: Gellerj, Wikimedia Commons, CC BY-SA 3.0.

Read more on Wikipedia

An American engineering society named the Delta Works one of the Seven Wonders of what?

or

Tap the right answer

Correct answer: The Modern World

The American Society of Civil Engineers chose the Delta Works together with the Zuiderzee Works. The list also includes the Channel Tunnel and the Panama Canal.

Read more on Wikipedia

Which American aid programme helped pay for the Delta Works?

or

Tap the right answer

Correct answer: The Marshall Plan

The Marshall Plan, which helped Europe rebuild after the Second World War, gave about 400 million guilders. Money from the discovery of Dutch natural gas helped as well.

Read more on Wikipedia

Which was the very first of the Delta Works, finished in 1958?

or

Tap the right answer

Correct answer: The storm surge barrier on the Hollandse IJssel

In 1953 the dykes along the Hollandse IJssel came close to breaking, which put about 1.5 million people at risk. So this barrier near Rotterdam was built first, while the Haringvliet dam took until 1971.

Photo: Jan van Galen, Wikimedia Commons, CC BY-SA 4.0.

Read more on Wikipedia

Your result

More quizzes and Duos in the free Votur app
Google Play App Store

Want to make a quiz like this yourself? Do it on Votur, it's free.

Also fun

How well do you know Maastricht?10How well do you know Groningen?10How well do you know Gouda?10How well do you know Eindhoven?10How well do you know Den Bosch?10How well do you know Rotterdam?10
InstagramTikTokFacebookYouTubePinterestX